RENEWABLE ENERGY

06.2019

POTĘGOWO-WEST WIND FARM

“Comprehensive construction of the HV cable line and 2 fiber optic lines GPO Sulechówko – SE Słupsk for the construction of the Potęgowo-West Wind Farm.” Investor: Potęgowo Mashav Sp. z o. o. Employer: ELECTRUM Sp. z o.o.

03.2019

STARZA WIND FARM, RYBICE KARNICE II

“Design and construction of the 110kV cable line GPZ Kamień Pomorski – RS Rybice – GPZ Skrobotowo together with the RS Rybice network switching station and extension of GPZ Skrobotowo for the needs of power exit from FW Rybice, FW Starza and FW Karnice II with a total capacity of 88 MW.” Scope of works performed: Investor: PGE KLASTER Sp. z o.o. Employer: Przedsiębiorstwo EL-IN Sp. z o.o.

09.2018

POTĘGOWO WIND FARM

Installed power: 118.25 MW. The scope of services provided: comprehensive implementation of MV network – fiber optic network – earthing network. Investor: Potęgowo Winergy Sp. z o.o. Employer: Przedsiębiorstwo Budownictwa Drogowo-Inżynieryjnego S.A.

10.2018

CONSTRUCTION OF A POTĘGOWO-EAST WIND FARM

Installed power: 101.25 MW. The scope of services provided: comprehensive execution of the HV cable line and fiber optic lines. Investor: Potęgowo Winergy Sp. z o.o. Employer: ELECTRUM Sp. z o.o.

2016

WIND FARM JABŁONOWO

Installed power: 3MW (2 turbines) Scope of services: – comprehensive MV network – fiber optic network – earthing network. Employer: MEGA S.A.

2016

WIND FARM MYCIELIN

Installed power: 48 MW (24 turbines) Scope of services: – comprehensive MV network construction – fiber optic network – earthing network between turbines and turbines and GPO – installation of monitoring cameras. Employer: Przedsiębiorstwo Budownictwa Drogowo- Inżynieryjnego S.A.

2016

WIND FARM SŁUPIA

Installed power: 24 MW (12 turbines) Scope of services: – comprehensive MV network – fiber optic network – earthing network. Employer: MEGA S.A.

2015

PV FARM CZERNIKOWO

The photovoltaic farm in Czernikowo has become the largest photovoltaic power plant in Poland. Basic parameters of the installation: the installation is located on a plot of 5.6 ha. Installation area: 4 ha, installed capacity of 4 MW, almost 16,000 installed photovoltaic panels, 15 kV MV overhead connection. Scope of services: – cable sewage system with inspection chambers for telecommunication installations and low voltage – low voltage electrical installation – installation of a teletechnical installation for monitoring electricity production from individual panels and CCTV monitoring of a power plant – MV 15 kV connection from the overhead connection to two MV switchgears in the inverters buildings via a cable line – earthing installation and connections compensating structural elements, photovoltaic panels, fences, CCTV masts, inverter containers – as-built documentation. Employer: Global Energy Services Siemsa SA

2015

TYSZOWICE WIND FARM

Installed power: 30MW (15 turbines) Scope of services: – comprehensive implementation of the MV network – fiber optic network – earthing network Employer: Global Energy Services Siemsa S.A.

2015

LUBARTÓW WIND FARM

Installed power: 36.8 MW (16 turbines) Scope of services: – comprehensive construction of MV network – fiber optic network from GPO to wind turbines. Employer: Aldesa Nowa Energia Sp. z o.o.

2015

LUBARTÓW WIND FARM

Installed power: 36.8 MW (16 turbines) Scope of services: – comprehensive construction of MV network – fiber optic network from GPO to wind turbines. Employer: Aldesa Nowa Energia Sp. z o.o.

2015

GAWŁOWICE WIND FARM

Installed power: 6 MW (3 turbines) Scope of services: – comprehensive execution of MV network – fiber optic network – potential equalization and earthing networks Employer: ELECTRUM Sp. z o.o.

2015

RZEPIN WIND FARM

Installed power: 58 MW (29 turbines) Scope of services: – comprehensive construction of MV network – fiber optic network – earthing network Employer: MEGA S.A.

2015

TUCHOLA WIND FARM

Installed power: 6 MW (3 turbines) Scope of services: – comprehensive execution of the MV network Employer: MEGA S.A.

2015

CHOJNICE WIND FARM

Installed power: 6 MW (3 turbines) Scope of services: – comprehensive execution of the MV network Employer: MEGA S.A.

2015

ORLA WIND FARM

Installed power: 12 MW (6 turbines) Scope of services: – comprehensive implementation of the MV network – fiber optic network – earthing network Employer: ELECTRUM Sp. z o.o.

2015

KARWICE WIND FARM

Installed power: 40 MW (16 turbines) Scope of services: – comprehensive construction of MV network – fiber-optic network – earthing network – connection to the 30/110 kV subscriber transformer station, connection to wind turbines with their launching Employer: Aldesa Nowa Energia Sp. z o. o

2014

MAKÓW MAZOWIECKI WIND FARM

Installed power: 12 MW (6 turbines) Scope of services: – comprehensive execution of the MV network Employer: MEGA S.A.

2013

PIEŃKOWO II WIND FARM

Installed power: 30 MW (15 turbines) Scope of services: – comprehensive construction of MV network – fiber optic network. Employer: Iberdrola Engineering and Construction Poland Sp. z o.o.

2013

PIEŃKOWO I WIND FARM

Installed power: 8 MW (4 turbines) Scope of services: – comprehensive implementation of the MV network – fiber-optic network. Employer: Iberdrola Engineering and Construction Poland Sp. z o.o.

2013

MARSZEWO WIND FARM

Installed power: 44MW (22 turbines) Scope of services: – comprehensive construction of MV network – fiber optic network. Employer: Iberdrola Engineering and Construction Poland Sp. z o.o.

2013

ZOPOWY WIND FARM

Installed power: 30MW (15 turbines) Scope of services: – comprehensive construction of MV network – fiber-optic network. Employer: Iberdrola Engineering and Construction Poland Sp. z o.o.

2013

RESKO WIND FARM

Installed power: 14 MW (7 turbines) Scope of services: -comprehensive performance of MV electrical works Employer: Aldesa Nowa Energia Sp. z o.o; Aldesa Energias Renovables S.L.U

2012

KROBIA-SOUTH WIND FARM

The scope of services: – comprehensive execution of the HV line (length of the constructed cable line 16.583 km). Employer: Global Energy Services Siemsa S.A.

2012

NASIELSK WIND FARM

Installed power: 10 MW (5 turbines) Scope of services: – comprehensive construction of MV network – fiber optic network – earthing network Employer: MEGA S.A.

2012

ŻUROMIN I & 2 WIND FARMS

Installed power: 60MW (30 turbines) Scope of services: – comprehensive construction of HV line – MV network – fiber optic network – earthing network with resistance measurements Employer: Global Energy Services Siemsa S.A.

2012

ZGORZELEC WIND FARM

Installed power: 24 MW (12 turbines) Scope of services: – comprehensive construction of HV line (10,400 m length) – MV networks Employer: Global Energy Services Siemsa S.A.

2011

KRZĘCIN WIND FARM

Installed power: 12MW (6 turbines) Scope of services: – comprehensive MV network construction – fiber optic network – earthing network with resistance measurements Employer: Global Energy Services Siemsa S.A.

2011

PIECKI WIND FARM

Installed power: 32MW (16 turbines) Scope of services: – comprehensive MV network construction – fiber optic network – earthing network – power supply for GPZ’s own needs. Employer: Global Energy Services Siemsa S.A.

2011

GORZKOWICE WIND FARM – 2011

Installed power: 12 MW (6 turbines) Scope of services: -comprehensive realization of MV network of fiber-optic traction and earthing conductor -assembly of a complete MV-15kV switching station Employer: MEGA S.A.

2011

BYSTRA WIND FARM

Installed power: 22MW (5 turbines) Scope of services: – comprehensive MV network construction – fiber optic network. Employer: Iberdrola Engineering and Construction Poland Sp. z o.o.

2009

HNATKOWICE – ORZECHOWCE WIND FARM – 2009

Installed power: 12MW (6 turbines) Scope of services – comprehensive implementation of the fiber optic network – earthing network – power cables 4×10 mm2. Employer: Przedsiębiorstwo AGAT S.A.

2006

PUCK WIND FARM

Installed power: 24MW (12 turbines) Scope of services: – comprehensive implementation of MV network – teletechnical fiber-optic network – earthing network – power supply for own needs Employer: Przedsiębiorstwo AGAT S.A.